Hallo! Tracked shipping to Austria with Delivery Duty Paid for just €3.99  

Ship to
Austria
0
  • argentina
  • chile
  • colombia
  • españa
  • méxico
  • perú
  • estados unidos
  • internacional

Select your country

Americas

Europe

Rest of the world

portada Investigation of Project Delays in Construction Projects in the South African Rail Industry
Type
Physical Book
Language
English
Pages
106
Format
Paperback
Dimensions
22.9 x 15.2 x 0.7 cm
Weight
0.21 kg.
ISBN13
9789975154246

Investigation of Project Delays in Construction Projects in the South African Rail Industry

Itumeleng G. Motlhatlhedi (Author) · Generis Publishing · Paperback

Investigation of Project Delays in Construction Projects in the South African Rail Industry - G. Motlhatlhedi, Itumeleng

New Book Imported to Austria
Delivery: 04 Sep - 11 Sep Shipping: 16 to 20 business days.
52,96 €
Import costs and 10% VAT included in the price ✅
52,96 €

Synopsis "Investigation of Project Delays in Construction Projects in the South African Rail Industry"

"The construction industry is one of the largest contributing sectors towards the Gross Domestic Product of many countries globally, and South Africa is no exception. The construction industry in South Africa and globally, is marred with extensive delays. This is a persisting enduring challenge.This study investigated the project delay factors in construction projects, particularly in the Passenger Rail Agency of South Africa and Transnet's traction substation projects in the South African railway engineering environment. The research also presented the remedial actions and mitigations suitable to be implemented to manage project delays in the project engineering environment. The research was conducted through a literature review and a questionnaire survey. The deductive research approach was employed. An online questionnaire survey was used to collect primary data. The literature review summary revealed eight top project delay-causing factors in traction substation projects, forming the basis of the questionnaire. The questionnaire results correlated with the literature review. This dissertation proposed suitable measures to manage delays in construction projects, improving the quality of work, and reduction of cost and schedule overruns."

Customers reviews

Frequently Asked Questions about the Book

All books in our catalog are Original.
The book is written in English.
The binding of this edition is Paperback.

Questions and Answers about the Book

Do you have a question about the book? Login to be able to add your own question.

Opinions about Bookdelivery

More customer reviews